Berntsen Markers & Caps

Berntsen Survey Monument 

Berntsen Installation

  Installation

With Rock Breaker

Manual

 
Driving
 Adaptor
 
Manual
 Adaptor
Monuments should be installed using a rock breaker with a 7/8" chuck to meet manufacturers specifications. This ensures accurate vertical control and maximum penetration It is possible to install monuments with a sledgehammer and manual adaptor, but stability will not be as good and maximum penetration will not be achieved.

Elements of the System

 

Installation of a High-order Bench Mark Using a Finned-Sleeve Rod Monument

A 12" hole is augered to a depth of about 3.5 ft Rod monument driven to refusal, until top is about 6" below surface Finned sleeve placed over rod, filled with grease & s.s. datum point added
A 6" PVC pipe with access cover glued on, is placed over the finned sleeve. Hole & pipe are backfilled with sand. Top 12" is back-filled with concrete The finished mark - a well protected first-order bench mark.