Survey Monument
System
| The Rod Monuments | Top security Rod Monuments | Sleeved Rod Monument with Floating Sleeve | Soil Conditions |
![]() |
![]() |
![]() |
In the first 2 or 3 feet of soil, movement - mainly vertical may take place due to swelling and shrinking, thermal expansion or frost
heave
3ft |
|
Below 3ft little movement occurs. The rod monuments are firmly anchored into this stable layer by ground friction, and can be driven to refusal if required. 6ft |
|||
|
Rod monuments are a series of 5/8" aluminium rods, usually 3ft long, which are driven into the ground either until they reach refusal, or when it is considered they have reached stable ground. |
These are exactly the same as the rod monuments, except that, for the top section, a security rod with 3 aluminium fins is used. This increases the stability of the mark. |
Where a rod monument is to be used for precise vertical measurements, the top section is encased in a grease-filled plastic sleeve, thus isolating the rod from any movements of the surrounding soil. The sand
backfill also helps in this process. |
Experience and tests in USA and Canada show that if rod monuments are installed to manufacturers specifications, only sub-millimeter movements' may be expected in X, Y and Z axes over a period of several years. Sample test results are available from Holtwood on request. |